Electricity Regulatory Commission
Modernized the official ERC government portal with Next.js, significantly improving accessibility and information architecture. Integrated Redux for robust data handling and Framer Motion for a polished, authoritative digital presence.

Project Overview & Objectives
The Electricity Regulatory Commission of Nepal needed a complete digital transformation of their public-facing portal. The legacy ASP.NET site was slow, inaccessible, and difficult to maintain.
Modernized the information architecture to WCAG AA standards using Next.js static generation for document-heavy pages that load instantly even on slow connections.
Tech Stack Used
Next.js
Static generation for document-heavy pages with instant loads and zero server cost
Redux
Centralized data layer for regulatory document management and search
Framer Motion
Polished transitions for an authoritative yet modern government presence
Tailwind CSS
Consistent design system aligned with government branding guidelines
Challenges & Technical Solutions
Migrating legacy ASP.NET content to Next.js without losing SEO rankings or breaking URLs
Staged migration with 301 redirects and preserved URL structures to retain indexed page authority
Complex document hierarchy with search across 1000+ PDFs in both Nepali and English
Full-text search indexing with fuzzy matching for bilingual document discovery
Key Metrics & Results
3x faster than legacy
Page Load Improvement
96 / 100
Accessibility Score
50K+
Monthly Visitors
Tags: Government Website ModernizationNepal Government Portal Next.jsPublic Sector Web DevelopmentWCAG Accessible Government Site